Date: from (month/year) to (month/year)
|
Country:
|
from 02/1977 to 04/1979
from 02/1975 to 12/1975
|
Bulgaria
|
05/1987
|
Czech Republic
|
from 01/1984 to 07/1988
|
Belarus / Lithuania
|
from 02/1989 to 11/1990 and from 11/1988 to 05/1990
and
from 02/1988 to 11/1990 and from 05/1992 to 11/1995 and
from 05/2000 to 07/2000
|
Russian Federation
|
from 05/1993 to 11/1995
|
PR of China
|
from 03/1993 to 05/1995
|
Latvia
|
from 01/1995 to 12/1995
|
Croatia
|
from 07/1995 to 05/1996 and 05/2003 to ongoing
|
Republic
of Slovenia
|
from 01/1998 to 10/1998 and 07/08 2003
|
Turkey
|
from
11/2000 to 06/2001
|
Poland
|
from 06/2001 to 04/2002
|
Republic of Uzbekistan
|
from
09/2001 - ongoing
|
Republic of Macedonia
|
Professional experience
record:
Date:
|
from
2001 –2003
|
Location:
|
Republic of Macedonia
|
Company:
|
PROWA
Black & Veatch GmbH
|
Position:
|
Project Manager / Process Design Engineer
|
Description:
|
Municipal and Environmental Action Programme
(MEAP)
Rehabilitation / Extension / New building of a multitude of Water Works
and WWTPs and sewerage systems, programme control and management,
Design and Engineering, Tendering and Procurement procedures,
implementation, commissioning, supervision
Capacities of 40,000 to 330,000 PE (EBRD) |
Date:
|
from
1998 to 2000
|
Location:
|
Republic of Macedonia
|
Company:
|
PROWA
Black & Veatch GmbH
|
Position:
|
Process Design Engineer
|
Description:
|
Feasibility study for the catchment area of the Studencica-
Zletovica (RWSS) Water Supply System. This system comprises the source, 78 km of
main pipelines, the main distribution station, pressure valve stations,
pump stations and the local networks (KfW)
|
Date:
|
from
5/2002 to 9/2002
|
Location:
|
Republic of Macedonia
|
Company:
|
PROWA
Black & Veatch GmbH
|
Position:
|
Process
Engineer
|
Description:
|
Feasibility – study "Urban Water Supply System for the Samokov
Region
"
|
Date:
|
from
2001 to 2003
|
Location:
|
Poland
/ Slovenia/Turkey
|
Company:
|
HPC
Harress-Pickel-Consult AG
|
Position:
|
Expert
for Tender Evaluation
|
Description:
|
-
Evaluation
of tenders for works under PHARE Project PL 9907.02:
Bytom Waste Water Treatment Plant
- Evaluation of tenders for works under PHARE Project PL 9907.03
:
Modernisation
and Extension of the Central WWTP in
Tomaszów Mazowiecki – Sludge part
-
contract
N° 2003/58533 Slovenia:
The
waste water treatment plant and corresponding
sewage system Volče”
and “Ecological Rehabilitation
of the Idrijca River”
-
Assistance to Support the Evaluation of service tender:
Technical Assistance for Environmental Heavy Cost Investment
Planning
(EUROPEAID/114715/D/SV/TR)
|
Date:
|
from
1995 to date
|
Location:
|
Germany/
Macedonia/ Latvia
|
Company:
|
PROWA
Black & Veatch GmbH,
|
Position:
|
Manager
/ Process Design Engineer/Preparation of Tender Dossiers:
|
Description:
|
-
Rehabilitation
/ Extension / New building of a multitude of Water Works, Sewarage Systems
and WWTPs
Design of process and structural, mechanical and electrical designs,
costing, financing, and cost recovery schemes, Engineering, Tender and
Procurement Documents, Evaluation, EIA, implementation, Management of
construction supervision, works commissioning and start-up.
Capacities of 40,000 to 630,000 PE,
(EBRD)
Draft design, Tender dossier, Evaluation and Contracting for the
WWTP Kumanovo, FIDIC Plant and Design Build Book, (16 m Sfr), (Seco
Swiss)
|
Date:
|
from
6/2001 to 4/2002
|
Location:
|
Republic of Uzbekistan
|
Company:
|
PROWA
Black & Veatch GmbH,
|
Position:
|
Process
Engineer
|
Description:
|
System Pressure and Supply Interruption Analysis in the cities
of Bukhara and Samarkand
(Pressure Monitoring Programmeand Leak
detection) |
Date:
|
from
01/1998 to 10/1998
|
Location:
|
Turkey
|
Company:
|
Ing.-Büro
Dr.-Ing. Ott, Dresden in co-operation with cogito Frankfurt/Main
|
Position:
|
Process
Engineer
|
Description:
|
Pre-Feasibility Studies WWTP Siirt and WWTP
Sivas
|
Date:
|
from 1995 to 2001
|
Location:
|
Germany/Chemnitz
|
Company:
|
PROWA Black & Veatch GmbH
|
Position:
|
Project Manager / Process Designer/ Senior site supervisor
|
Description:
|
Central
WWTP Chemnitz-Heinersdorf
Refurbishment and new construction Process
Engineering, Basic and Detailed engineering, tender documents and
procurement, site supervision, Refurbishment of waste water pumping station
14,000 m3/h, Biological phosphorus and nitrogen removal,
Sludge treatment, incl. Biogas utilisation, Biological and chemical
exhaust air treatment, Capacity: 630,000 PE, 100,000 m³/d,
Initial Investment: 135 million Euro
|
Date:
|
from 01/1999 to 2003
|
Location:
|
Germany/Wernigerode
|
Company:
|
PROWA Black & Veatch GmbH
|
Position:
|
Project Manager, Process Engineer
|
Description:
|
Rehabilitation and Extension of Municipal
Water Works Wernigerode
Surface water treatment from Zillierbach lake
Design, upgrading of technology, Tender
Documents and procurement, site supervision, co-ordination
Capacity 10,000 m3/d
|
Date:
|
from
5/1999 to 10/2002
|
Location:
|
Germany/Wismar
|
Company:
|
Ing.-Büro
Dr.-Ing.Ott, Dresden in co-operation with PROWA Black & Veatch GmbH
|
Position:
|
Process
Design Engineer
|
Description:
|
Process Water Treatment for the Polystyrol-Plant of JACKON GmbH Wismar
|
Date:
|
from1998 to 1999
|
Location:
|
Germany/ Halle and Zeitz
|
Company:
|
PROWA Black & Veatch GmbH
|
Position:
|
Project manager
|
Description:
|
-Rehabilitation and Extension of Industrial
Water Treatment Plant Leuna AG Halle-Daspig:
Treatment plant for polluted river water from the Saale
river,
Capacity: 330,000 m3/d
-Rehabilitation and Extension of Industrial
Water Treatment PlantRadici AG Zeitz: Industrial
water treatment plant, Treatment of heavy polluted water from the Elster
river, incl. micro filtration and reverse osmosis/nanofiltration,
Basic engineering, selection and design of the
plant equipment, evaluation of initial investment and operating cost,
Tender documentation, Procurement
Capacity:
88,000 m3/d |
Date:
|
from 1994 to 2003
|
Location:
|
Germany/
|
Company:
|
PROWA Black & Veatch GmbH
|
Position:
|
Project co-ordinator, Design Engineer and senior site supervisor
|
Description:
|
Rehabilitation
and extension of WWTP Köthen
Detailed
engineering, tender documentation and procurement,
Process flow
diagram, Biological phosphorus and nitrogen removal
The
developed treatment process is based on a combination of ”conventional
activated sludge process” with a ”Biofilm technology” in form of
suspended surface growth carriers, which are retained in the tank by means
of hydraulic separation. Sludge treatment with biogas utilisation.
Capacity:
45,000 PE / Investment: 13 million Euro
|
Date:
|
since
2001
|
Location:
|
Latvia
|
Company:
|
iC
consulenten Wien
|
Position:
|
Leading Expert
|
Description:
|
Potable Water Treatment and Waste Water
Treatment Consultancy -
18 towns project
Senior advisor and a team member of quality
assurance team for all tender documents
for water, sewerage and WWTP works projects in 18 Latvian municipalities–
EU ISPA funded –
|
Date:
|
from
01/1995 to 05/1996
|
Location:
|
Croatia and Slovenia
|
Company:
|
PROWA Black & Veatch GmbH
|
Position:
|
Project Manager
|
Description:
|
Reconstruction
and extension of the WWTPs Senj and Velenje
Elaboration of conceptual design
|
Date:
|
from 06/1971 to 12/1974 and 1999 to 2001
|
Location:
|
Germany
|
Company:
|
Water Management Institute Berlin/Prowa Black&Veatch GmbH
|
Position:
|
Project manager
|
Description:
|
Deep water aeration equipment for reservoirs
Design of hypolimnion aeration devices to improve
biological breakdown of chemical pollutants
and implementation, GFR polyester resins as carrier structures, Aeration
water from hypolimnions
without destruction of thermal stratification
1971-74:
Reservoir “Bleiloch-Dam”, “Rappbode-Dam“ „Sosa-Dam“
1999: Open-cast
lignite mine Großkayna near Leipzig to be filled with water
after ending of lignite production, 55 m m³ water, 35 m deep. |
Date:
|
from
05/1993 to 11/1995
|
Location:
|
PR
of China/Huaibei and Beijing
|
Company:
|
Ing.-Büro SORB-Umwelttechnik Dresden
|
Position:
|
Project
Manager
|
Description:
|
Foundation
of Joint Venture Companies
Preparation of byelaws and
operations schedules for privatised companies |
Date:
|
from
05/1992 to 11/1995
|
Location:
|
Królewiec
and St. Petersburg / Russian Federation
|
Company:
|
LURGI Frankfurt/Main/ INTERECOTEC Moskau
|
Position:
|
Manager
|
Description:
|
Co-operation
with Lenvodokanalprojekt and Królewiec
Water Supply
Rehabilitation / Extension / New building
Design of the works for Water Treatment Plants andWWTPs
|
Date:
|
from
02/1989 to 11/1990
|
Location:
|
Russian Federation
|
Company:
|
Academy for Municipal Utility Management – Moscow/
Ing.büro SORB-Umwelttechnik Dresden
|
Position:
|
Project Manager / Process Engineer
|
Description:
|
Rehabilitation
and extension of Water Works
Treatment of heavy loaded water to drinking water, using activated
carbon
Basic engineering, Supervision of design
Capacity: from 100,000 to 800,000 m3/h
|
Date:
|
from
1982 to 1990
|
Location:
|
Germany
|
Company:
|
Ministry for Environmental Protection and Water
Management
|
Position:
|
Project Manager / Process Engineer / Senior site
supervision
|
Description:
|
Rehabilitation
and extension of 4 major Water Works in Berlin, Dresden, Halle and Rostock
Treatment of heavy loaded river water to drinking water, using
activated carbon
Basic engineering, Supervision of design and Tendering
procedure, implementation,
Capacity: from 100,000 to 800,000 m3/h
|
Date:
|
from
02/1988 to 11/1990
|
Location:
|
Russian
Federation/Moscow
|
Company:
|
Ministry for Environmental Protection and Water
Management/
Academy of Sciences –
Berlin/Moscow
|
Position:
|
Project Manager
|
Description:
|
Development
of biosensors for water-related processes
Development of the biosensors
for instantaneous measurement of biochemical oxygen consumption,
caprolactam, phenols and chlorine-organic substances in media with a
complex composition
|
Date:
|
from
11/1985 to 06/1989
|
Location:
|
Germany
|
Company:
|
Ministry for Environmental Protection and
Water Managemen
|
Position:
|
Project Manager and Project Designer
|
Description:
|
-
Application of activated carbon in a multitude of water treatment systems
-
Basic engineering for production and re-generation of activated carbon
Process Engineering for potable water treatment
|
Date:
|
from
01/1984 to 07/1990
|
Location:
|
Russian Federation / Belarus / Lithuania
|
Company:
|
Ministry for Environmental Protection and
Water Management
|
Position:
|
Manager of the R&D team „Government treaty GDR-USSR on the
cooperation towards the creation of new technologies for all large-scale
drinking water supply and waste water treatment projects in the USSR and
GDR".
|
Description:
|
Rehabilitation
/ Extension / New building of WWTPs
Basic engineering
WWTP Adler Sotchi - Russia
WWTP Oil refining works Novopolozk - Belarus
WWTP Radvilishkis - Lithuania
|
Date:
|
from
01/1980 to 12/1986
|
Location:
|
Germany
|
Company:
|
Ministry for Environmental Protection and
Water Mgmt.
|
Position:
|
Project Manager
|
Description:
|
Development
of a regeneration device for filter sand of slow-working sand filters
Design
and construction of infiltration basins and cleaning devices for filtering
materials (automatic filter backwash system without interruption of the
filtration process)
|
Date:
|
from 01/1979 to 06/1984
|
Location:
|
Germany
|
Company:
|
Ministry for Environmental Protection and Water Management
|
Position:
|
Project Manager
|
Description:
|
Development
of combined coagulation and tubular settling tanks
Specification and design of tubular settling tanks
|
Date:
|
from 01/1979 to 11/1983
|
Location:
|
Germany
|
Company:
|
Ministry for Environmental Protection and Water Management
|
Position:
|
Project Manager
|
Description:
|
Multimedea
filtration in Water Treatment Plants
Development of specification method and filter media |
Date:
|
from
06/1978 to 06/1982
|
Location:
|
Germany
|
Company:
|
Ministry for Environmental Protection and
Water Management
|
Position:
|
Project Manager
|
Description:
|
Development of a belt scraper for rectangular secondary sedimentation
tanks.
Design documentation and manufacturing of belt
scrapers.
|
Date:
|
from
01/1979 to 04/1980
|
Location:
|
Bulgaria
|
Company:
|
Ministry for Environmental Protection and
Water Management
|
Position:
|
Member of the International
working party for the formation of the Association ”Intervodootshistka”
|
Description:
|
Preparation
of the agreement on formation, statutes, structure and financial plan,
Development
of production processes for water treatment equipment
|
Date:
|
from
06/1971 to 06/1976
|
Location:
|
Germany
|
Company:
|
Water Management Institute Berlin
|
Position:
|
Project Manager
|
Description:
|
Development
of centrifugal aerators for waste water treatment
Industrial facilities and municipal waste water utilities in
Brandenburg, Sachsen, Mecklenburg
Disk aerators as surface rotors |
Date:
|
from 01/1965 to 12/1969
|
Location:
|
Germany
|
Company:
|
Wasserwirtschaftsdirektion
Obere Elbe
|
Position:
|
Design Engineer
|
Description:
|
River
design and engineering of barrages, weirs and dams |
|